Innovative Solution for TBM and Pipe Jacking Projects
GN Solids Control (GNSC) has taken a significant step forward in environmental management and water conservation with the successful delivery of its GNTBM-320 Tunnel Boring Machine (TBM) Mud-Water Separation System to a domestic client. This cutting-edge system is designed to tackle the unique challenges posed by TBM and Pipe Jacking construction projects, where large volumes of slurry containing various solids are produced.
Efficient Slurry Management for Urban Tunneling
The GNTBM-320 system offers an advanced solution for separating slurry into reusable water and solid waste, a crucial process for minimizing environmental impact and conserving water resources. With a comprehensive lineup of equipment—including shale shakers, desanders, desilters, bottom drying shakers, feed pumps, and mud tanks—the system is engineered to deliver maximum separation efficiency.
Compact Design for Space-Constrained Projects
Understanding the space limitations of urban tunneling projects, GNSC has designed the GNTBM-320 system with a compact, multi-level foundation. This allows for seamless integration into tight construction environments, ensuring high treatment efficiency without compromising on performance.
GNSC’s innovative approach with the GNTBM-320 system sets a new standard in sustainable construction practices for urban tunneling projects.